North Melbourne Aquatic Centre Backwash Recovery System

Casey ARC

June 2011. Roejen was asked to install a backwash recovery plant at Casey ARC in 2011. The site is owned by the...
Read More

Noble Park Aquatic Centre

June 2011. Roejen was asked to manufacture and commission a MechMate Automation Platform at the new Noble Park Aquatic Centre in 2011....
Read More

Baulkham Hills Waves

March 2012 Roejen was asked to design and install plant and equipment at the Baulkham Hills Waves Centre. The site is owned...
Read More

Eastern Beach Pool

November 2011 Roejen was asked to install a small control platform at the Eastern Beach Swimming Pool Located on the foreshore in...
Read More

Derrimut Aquatic Centre

July 2011 to January 2012. Roejen was asked to design and supervise the installation of plant and equipment at the new Derrimut...
Read More