Baulkham Hills Waves

Project Info

Project Description

March 2012

Roejen was asked to design and install plant and equipment at the Baulkham Hills Waves Centre. The site is owned and operated by Shire of Baulkham Hills. The site has a 25 metre pool and a 18 x 18 metre teaching pool. The existing plant was replaced with ultra fine filtration system and UV generator. This will enhance the ability of the system to recover when dealing with the extreme loads now experienced.

Equipment installed was:

  • Prominent Procal Dry Chlorine Feeder
  • Siemens Barrier M UV system
  • MechMate Plant Automation and dosing control system
  • Atlas Ultra fine Precoat filter
  • 7.5 kw Calpeda pump