Don Tatnell Aquatic Centre

Project Info

Project Description

March 2012

Located in the City of Kingston in south east Melbourne. Don Tatnell Aquatic Centre has a 25 metre pool, a spa and an extensive dry facility. Roejen was asked to design and install a MechMate Automation and Dosing Platform to compliment the existing spa system. Both systems were designed to augment the existing MechMate platform at Kingston Waves. The operator at both sites can remotely access the plant and receive emails and SMS information if there is an alarm.

The AGL Group replaced the filtration and heating plant as part of the scope of works. The filters were replaced with a medium rate sand system.

The Mechmate platform also monitors the heating system.

Equipment installed was:

  • Siemens Barrier M UV system (existing)
  • MechMate Plant Automation and dosing control system
  • 2 x 7.5 kw pumps
  • Raypak Pool Heaters and heating pumps